Water · Bottom Layer

Water Wells

From study and permitting to construction, supervision and long-term monitoring. A full cycle of services for water wells and springs, for drinking water, irrigation and industrial use, with a project management system that keeps track of every stage.

What it includes

A full cycle of services

We cover the entire water well project, from study and permitting to construction, supervision and long-term monitoring through our own system.

Permitting & Legalisation

Complete permit applications for new water wells or legalisation of existing ones: preparation of studies, submission and support at every stage.

  • Water well permitting studies
  • Legalisation of existing wells
  • Liaison with the competent authorities

Construction & Supervision

Supervision of well construction by a specialist geologist, pumping tests and handover of a fully documented water well.

  • Well construction supervision
  • Pumping tests
  • Technical report
  • Video logging with a PASI camera
In-house tool

Project Management & Monitoring

Our own project management system keeps the client informed by email at every stage, from the preliminary study to monitoring after handover.

  • Real-time project progress updates
  • A digital file for each water well
See details

Combined investigation

Geophysical survey before drilling

Before drilling, electrical resistivity tomography (ERT) images the subsurface and shows where the water-bearing zones are likely to be.

This places the well at the most suitable point and at the right depth.

It is not needed for every well. We recommend it when the local geology is complex or unknown, or when we judge that it can provide valuable information for a successful project.

Geophysical surveys →

Equipment & Methodology

From construction to handover

We combine construction with modern quality control and monitoring equipment, for the reliable handover of every well.

Water well construction — drilling rig in the field

Construction

Well Construction Supervision

A geologist on site during construction: logging the stratigraphy, following progress, selecting screen positions and designing the casing according to the actual ground conditions.

PASI well camera — video inspection of a well

Quality Control · PASI

Well Video Inspection

Inspection inside the well with a PASI well camera: checking casing integrity, locating damage, corrosion or clogging, and documenting its condition before and after use.

Solinst TLC 107 — measurements in a well

Monitoring · Solinst

Water Level & Quality Measurements

Solinst TLC 107 for measuring water level, temperature and electrical conductivity: core equipment for post-construction inspections and long-term well monitoring.

In-house tool

log Studio icon

log Studio

Geotechnics · Boreholes

Borehole logs to ISO 14688/14689: stratigraphy, samples and SPT, core recovery and RQD, laboratory tests, groundwater level and well construction, with PDF export.

These tools are used exclusively to support our clients and are not for sale.

Water well log from log Studio: lithology, hydrogeological description, static and pumping water levels, construction with casing and screens
Water well log from log Studio

Ongoing Service

Management of Water Wells & Water Use Permits

A full cycle of compliance and legality

For individuals and legal entities with existing water wells, we organise and maintain the digital file of permits and water meters, and calculate consumption as a percentage of the annual limit from the meter readings the client sends us. All information is kept in an internal system, so the client always has a clear, up-to-date picture of their status.

01

Client Projects

One file per client with contact details, documents, correspondence and history.

02

Water Sources

Record of each abstraction point (well, dug well, spring) with technical characteristics and status.

03

Water Use Permits

Tracking of the abstraction volume and renewal dates of each permit.

04

Water Meters & Readings

Register of water meters with serial number, installation date and periodic consumption readings.

Water use permit overview: abstraction, permit limit, consumption and alerts

How the process works

5 steps of the full management cycle

  1. 1Preparation or entry of the file
  2. 2Issue or renewal of permits
  3. 3Water meter installation
  4. 4Periodic meter readings
  5. 5Calculation & client update

Steps 4 and 5 are repeated in every reading period

Who it is for
  • Water utilities
  • Local irrigation organisations (TOEB)
  • Agricultural cooperatives
  • Farmers
  • Industry & small manufacturing
  • Bottling plants
  • Private individuals

Access to the system

Ways to join the management system

Free · Already active

Existing clients

Everyone who has worked with Geomec on a permit for an existing or new water source, including earlier clients of the sole proprietorship, is already included in the system at no cost.

Activating updates: for automatic updates to work, send us your contact email & mobile number at info@geomec.gr or through the contact form.

Free · Part of the service

New clients — with an assignment

When you assign Geomec a new service (permitting, a new well, a study), you are automatically included in the management system as part of that service, at no extra cost.

How it works: once the assignment is confirmed, we open a project and client record, and updates start automatically.

Paid · Custom setup

External onboarding

If you have not worked with Geomec before but would like your water sources added to the management system, this is possible through an initial process:

  • Digitisation of your file (once you provide it)
  • A site visit to the water sources if needed
  • Opening a project and client record

Cost: a tailored quote depending on the nature of the file, the number of water sources and the irrigated plots.

What free inclusion covers: Free participation covers only the recording and maintenance of the water source data in Geomec's internal management system, and the sending of informational messages when relevant legislative developments or upcoming deadlines are identified, as far as we are able. It does not include new studies, amendments or renewals of permits, extensions, permitting, the preparation and submission of declarations to the competent authorities, or legal advice or representation; these are all charged separately. Responsibility for compliance and for meeting any obligations towards the competent authorities remains with the permit holder.

Contact us

Legal framework: The service relates to Directive 2000/60/EC, Greek Law 3199/2003 and Joint Ministerial Decision 146896/2014 (as amended). Geomec supports its clients by carefully following the legislative developments that come to our team's attention, without however guaranteeing full or timely coverage of every change in the legal framework. Final responsibility for compliance remains with the holder of the permit / water source, who is legally accountable to the competent authorities.

Planning a new water well or have an existing one?

Whether you need a permit for a new well, legalisation of an existing one, construction supervision or inspection and monitoring, our team handles every stage with a well-documented methodology.

Request a Quote